PIKESVILLE PUMPING STATION

Project Features:
• replacement of existing chlorination building with
1,000 square foot building housing new chlorinators, feeders,
chlorine tanks and control systems
• addition of 90 IF of 30-inch and 200 If of 48-inch
emergency suction piping
• pump addition including two new 17.5 MGD high
service pumps, two 24-inch cone valves, suction
and discharge piping, electrical controls and feeders,
equipment pads and 200 If of 48-inch diameter
suction piping
• completed: 1999

Services Provided:
• full site evaluation
• civil/site design
• erosion/sediment control design
• architectural services for the chlorination facility
• pump and equipment specifications
• construction phase services